Consider a system with four processes and four resources as follows: P is a set of processes as P= {P1, P2, P3, P4} R is a set of resources as R= {R1, R2, R3, R4} R1, R2, R3 and R4 have two instances. The Snapshot at time T0 has the following situation: P1 allocates an instance of R1 and R3 while requesting an instance of R2. P2 allocates an instance of R2 and R4 while requesting an instance of R1. P3 allocates an instance of R1 and request R4. P4 allocates an instance of R2 and doesn’t need any other resource. 1. Draw the resource allocation graph.