Please can you show the flow:Identify the main departments and their roles:
Processing Department (PD)
Roasting Department (RD)
Packaging and Sales Department (PSD)
Break down the process into individual steps:
SD: Retrieve and transport 20 units of product to the main PD floor's temporary storage area
PD1: Calibrate the Huller machine and process 1 unit at a time, discarding waste
PD2: Calibrate the Cleaning Machine, clean coffee beans, and check for clogs
RD1: Retrieve a 10 - gram sample from each unit and test for acidity levels and quality
RD2: Preheat the roasting machine and process 1 unit at a time
PSD1: Retrieve 1 unit of roasted beans, add them to the conveyor belt, and package 1Kg bags
PSD2: Seal the 1Kg bags and place them on the sales storage shelves
Create a flowchart using the following symbols:
Oval: Start/End
Rectangle: Process
Diamond: Decision
Arrow: Flow
Design the flowchart:
Start with an oval labeled "Start"
Add a rectangle with the label "SD: Retrieve and transport 20 units of product"
Add a rectangle with the label "PD1: Calibrate Huller Machine and process units"
Add a rectangle with the label "PD2: Calibrate Cleaning Machine and clean beans"
Add a rectangle with the label "RD1: Test and grade coffee beans"
Add a rectangle with the label "RD2: Preheat and roast coffee beans"
Add a rectangle with the label "PSD1: Package roasted beans"
Add a rectangle with the label "PSD2: Seal and store packaged bags"
End with an oval labeled "End"
Connect the symbols with arrows to show the flow of the process.