Average Labor Rate: $24, Employee/Shift (Prestige line): 18, Days/Year: 360, Hours/shift: 8, Shifts/day: 2, Run Time (seconds/unit): 0.4, Setup Time (minutes/lot): 90, Employees/Shift: 18, Scrap Material Cost/Setup: $290.75, Labor Cost/Setup: $648, Total Cost/Setup: $938.75,
Year: 2012: Volume (units/year): 18,648,799, Total Run Time/Year (unit): 2076 Average Production Quantity (lot size): 15,000 Total Material Cost of Production $129,429,876
Determine the capacity (in units/year), capacity utilization, and average WIP inventory (in units and dollars) for the Prestige line in 2012.