Discover a wealth of knowledge and get your questions answered at IDNLearn.com. Ask your questions and receive reliable, detailed answers from our dedicated community of experts.

A crate is dragged up a ramp at constant speed. The work done on the system can be accounted for by:
- Eel
-Eg
-Ek
-Eint
-both Eg and Eint


A Crate Is Dragged Up A Ramp At Constant Speed The Work Done On The System Can Be Accounted For By Eel Eg Ek Eint Both Eg And Eint class=

Sagot :

Answer:

The work done on the system can be accounted for by;

Both [tex]E_g[/tex] and [tex]E_{int}[/tex]

Explanation:

The speed of the crate = Constant

Therefore, the acceleration of the crate = 0 m/s²

The net force applied to the crate, [tex]F_{NET}[/tex] = 0

Therefore, the force of with which the crate is pulled = The force resisting the upward motion of the crate

However, we have;

The force resisting the upward motion of the crate = The weight of the crate + The frictional resistance of the ramp due to the surface contact between the ramp and the crate

The work done on the system = The energy to balance the resisting force = The weight of the crate × The height the crate is raised + The heat generated as internal energy to the system

The weight of the crate × The height the crate is raised = Gravitational Potential Energy = [tex]E_g[/tex]

The heat generated as internal energy to the system = [tex]E_{int}[/tex]

Therefore;

The work done on the system = [tex]E_g[/tex] + [tex]E_{int}[/tex].

Thank you for joining our conversation. Don't hesitate to return anytime to find answers to your questions. Let's continue sharing knowledge and experiences! Your questions are important to us at IDNLearn.com. Thanks for stopping by, and come back for more reliable solutions.