Recall that:
The capacity of the interaction is controlled by the capacity of the bottleneck workers.
The extra resources accessible ought to be added to workers with the most noteworthy preparing times.
For this situation, they are Worker A and Worker E.
Summing up of resources halves the handling times for Worker A and E.
SO;
Worker Old time(sec) New time (sec) Capacity
A 65 32.5 1.85
B 35 35 1.71
C 25 25 2.40
D 30 30 2.00
E 60 30 2.00
Along these lines, the new capacity of the framework is characterized by new bottleneck B.
So the capacity of the cycle is 60/35 = 1.71 toothbrush per each minute