IDNLearn.com: Your one-stop platform for getting reliable answers to any question. Join our platform to receive prompt and accurate responses from experienced professionals in various fields.
Book name: Construction Methods and Management Stephens W. Nunnally Eighth Edition
Question: You measure a seismic velocity of9000 ft/s (2743 m/s)in limestone.Would you expect this rock to be rippableby a D9H tractor equipped with a ripper (Figure 17)?Ifso,would you recommend using a single or tandemripper in this situation? Why?
Question 2: Estimate the hourly production and unit cost ofrockexcavation by drilling and blasting.The rock is a lime-stone having a seismic velocity of6000 ft/s (1830 m/s).Trial blasting indicates that 31⁄2-in.(8.9-cm) holesdrilled in an 8-ft (2.44-m) rectangular pattern willprovide the desired fracturing.A hole depth of20 ft(6.1m) yields an effective depth of18 ft (5.5 m).Theaverage drilling rate is estimated to be 70 ft/h(21.4m/h).Apowder factor of1 lb/BCY (0.59 kg/BCM)ofANFO will be used.
Question 3: A tractor-mounted ripper will be used for excavating alimestone having a seismic velocity of6000 ft/s (1830m/s).Field tests indicate that the ripper can obtain satis-factory rock fracturing to a depth of2 ft (0.61 m) withone pass ofa single ripper shank at 3-ft (0.91-m) inter-vals.Average ripping speed for each 400-ft (122-m) passis 1.5 mph (2.4 km/h).Maneuver and turn time at theend ofeach pass averages 0.3 min.Job efficiency isestimated at 0.70.Machine cost including the operatoris$130/h.Estimate the hourly production and unit costofexcavation.
Thank you for using this platform to share and learn. Don't hesitate to keep asking and answering. We value every contribution you make. IDNLearn.com is your go-to source for accurate answers. Thanks for stopping by, and come back for more helpful information.