XB Internal constraints
C. Set backs
D. None of the above
Question 12: A
consists of the aims and goals of the project the method of
achieving those aims and the resources needed in the method
A Feasibility study
B Plan
C Work break down structure
D. Initial phase
Question 13: Thabo has come up with an idea that would increase the profits of his com
He is therefore considered to be the project's
A Sponsor
B. Originator​