Answer:
c. $50.00 per machine hour
Explanation:
Calculation to determine the predetermined overhead allocation rate
Using this formula
Predetermined overhead allocation rate=Manufacturing overhead costs/Machine hours
Let plug in the formula
Predetermined overhead allocation rate=$500,000/10,000
Predetermined overhead allocation rate=$50.00 per machine hour
Therefore Predetermined overhead allocation rate is $50.00 per machine hour