The predetermined overhead rate is multiplied by the actual allocation base incurred by a job to find ______. Multiple choice question. the predetermined overhead rate for the job actual overhead the total cost of the job overhead applied to the job

Sagot :

The predetermined overhead rate is multiplied by the actual allocation base incurred by a job to find the applied overhead.

How to calculate the overhead applied in a job

Applied overhead is a fixed rate charged to a specific production job, good produced, or department within an organization.

This overhead applied are calculated by finding the product of the predetermined overhead rate and the actual allocation base incured by a job

Hence we can conclude that the predetermined overhead rate is multiplied by the actual allocation base incurred by a job to find the applied overhead.