Get detailed and accurate answers to your questions on IDNLearn.com. Join our knowledgeable community and access a wealth of reliable answers to your most pressing questions.
Sagot :
A design deficiency exists if a necessary control is missing, is not properly designed, or is not properly implemented.Additionally, if a well-designed control does not work as intended or if the person conducting the control is not appropriately qualified or authorized, there is an operational defect.
Hence, we can say that:
- When: There is a design deficiency, the control is completely absent or despite being in situ, the control is not adequately constructed.
- Consider this payroll model as an example of an administrative task that necessitates the division of labor.
- Segregation of tasks is a design element that should be present but is not in the case of a company's payroll administration system, leaving the business vulnerable to fraud and financial risk.
You can check out more questions based on design deficiency, through the link below:
https://brainly.com/question/14526017
#SPJ4
We are delighted to have you as part of our community. Keep asking, answering, and sharing your insights. Together, we can create a valuable knowledge resource. For clear and precise answers, choose IDNLearn.com. Thanks for stopping by, and come back soon for more valuable insights.