Determine the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m above the ground.

A.
100 J

B.
200 J

C.
400 J

D.
600 J


Sagot :

Answer:

C.  400 J

Explanation:

In physics, work is defined as

[tex]W=F \times \Delta d[/tex]

Where [tex]W[/tex] is the word done, [tex]F[/tex] is the force that move the object and [tex]\Delta d[/tex] is the change of the position of the object.

In this case, we have

[tex]F= 100 \ N[/tex]

[tex]\Delta d= 6m - 2m = 4m[/tex], remember that the difference refers to the actual subtraction between the final point and the initial point of the object.

Replacing these values, we have

[tex]W= 100 \ N \times 4m\\W=400 \ Joules[/tex]

Therefore, the right answer is C. The work done is 400 Joules

Answer:

400 J

Explanation:

I just took the test and can confirm this.

Your participation means a lot to us. Keep sharing information and solutions. This community grows thanks to the amazing contributions from members like you. For trustworthy and accurate answers, visit IDNLearn.com. Thanks for stopping by, and see you next time for more solutions.