Sagot :
From the information given we can say that the work of rate of Beth is 6h/floor. When they work together with Mike, we can represent the situation with the equation:
[tex]\frac{t}{B}+\frac{t}{M}=1[/tex]Where B is the rate of Beth and M is the rate of Mike, t is equal to 2.4 hours. Replacing the values we have:
[tex]\begin{gathered} \frac{2.4}{6}+\frac{2.4}{M}=1 \\ 0.4\text{ }+\frac{2.4}{M}=1\text{ (Dividing)} \\ \text{ }\frac{2.4}{M}=1\text{ }-0.4\text{ (Transposing 0.4 to the other side of the equation)} \\ \frac{2.4}{M}=0.6(\text{ Subtracting)} \\ \frac{2.4}{0.6}=M\text{ (Isolating M)} \\ 4\text{ =M} \\ \text{Answer is: Mike takes 4 hours to tile a floor} \end{gathered}[/tex]
Thank you for using this platform to share and learn. Don't hesitate to keep asking and answering. We value every contribution you make. Your questions deserve accurate answers. Thank you for visiting IDNLearn.com, and see you again for more solutions.