1) Cuatro hombres hacen una obra en 12 días. ¿Cuánto tiempo se demoran siete hombres para hacer la misma obra?

Sagot :

Final answer:

To find how long 7 men take to complete a job done by 4 men in 12 days, apply the Men x Days = Work formula, resulting in 6.857 days.


Explanation:

To determine how long 7 men will take to complete the same job that 4 men do in 12 days, you can use the formula: Men × Days = Work. In this case, 4 men complete the job in 12 days, so the total work is 4 × 12 = 48 men-days. As 7 men will be working, the time they will take can be calculated as 48 ÷ 7 = 6.857 days.