Get comprehensive solutions to your questions with the help of IDNLearn.com's experts. Get comprehensive answers to all your questions from our network of experienced experts.
Sagot :
Sure! Let's find out which equation models the total profit, [tex]\( y \)[/tex], based on the number of tickets sold, [tex]\( x \)[/tex].
We have two known data points:
1. When 100 tickets were sold, the profit was \[tex]$300. 2. When 200 tickets were sold, the profit was \$[/tex]700.
First, we need to determine the rate of change of profit, or the slope, between these points.
The formula for the slope ([tex]\( m \)[/tex]) between two points [tex]\((x_1, y_1)\)[/tex] and [tex]\((x_2, y_2)\)[/tex] is:
[tex]\[ m = \frac{y_2 - y_1}{x_2 - x_1} \][/tex]
Substituting the given points [tex]\((100, 300)\)[/tex] and [tex]\((200, 700)\)[/tex]:
[tex]\[ \text{Slope} = \frac{700 - 300}{200 - 100} = \frac{400}{100} = 4.0 \][/tex]
The slope [tex]\( m \)[/tex] is 4.0.
We can now use the point-slope form of a linear equation to model the total profit [tex]\( y \)[/tex] based on the number of tickets sold [tex]\( x \)[/tex]. The point-slope form equation is:
[tex]\[ y - y_1 = m(x - x_1) \][/tex]
We will use the point [tex]\((100, 300)\)[/tex] and the calculated slope 4.0:
[tex]\[ y - 300 = 4.0(x - 100) \][/tex]
Thus, the equation that models the total profit based on the number of tickets sold is:
[tex]\[ y - 300 = 4(x - 100) \][/tex]
Therefore, the correct equation is:
A. [tex]\( y - 300 = 4(x - 100) \)[/tex]
We have two known data points:
1. When 100 tickets were sold, the profit was \[tex]$300. 2. When 200 tickets were sold, the profit was \$[/tex]700.
First, we need to determine the rate of change of profit, or the slope, between these points.
The formula for the slope ([tex]\( m \)[/tex]) between two points [tex]\((x_1, y_1)\)[/tex] and [tex]\((x_2, y_2)\)[/tex] is:
[tex]\[ m = \frac{y_2 - y_1}{x_2 - x_1} \][/tex]
Substituting the given points [tex]\((100, 300)\)[/tex] and [tex]\((200, 700)\)[/tex]:
[tex]\[ \text{Slope} = \frac{700 - 300}{200 - 100} = \frac{400}{100} = 4.0 \][/tex]
The slope [tex]\( m \)[/tex] is 4.0.
We can now use the point-slope form of a linear equation to model the total profit [tex]\( y \)[/tex] based on the number of tickets sold [tex]\( x \)[/tex]. The point-slope form equation is:
[tex]\[ y - y_1 = m(x - x_1) \][/tex]
We will use the point [tex]\((100, 300)\)[/tex] and the calculated slope 4.0:
[tex]\[ y - 300 = 4.0(x - 100) \][/tex]
Thus, the equation that models the total profit based on the number of tickets sold is:
[tex]\[ y - 300 = 4(x - 100) \][/tex]
Therefore, the correct equation is:
A. [tex]\( y - 300 = 4(x - 100) \)[/tex]
Answer:
Let's analyze the problem step by step based on the given information:
1. First Show Details:
- Tickets sold: 100
- Profit: $300
2. Second Show Details:
- Tickets sold: 200 (total, so tickets sold in the second show = 200 - 100 = 100)
- Profit: $700
We need to find an equation that models the total profit [tex]y[/tex] based on the number of tickets sold [tex]x[/tex].
• Let's use the information given:
- For the first show: [tex]( y¹ = 300)\: when\: ( x¹ = 100)[/tex]
- For the second show: [tex]( y²= 700)\: when \: ( x² = 200)[/tex]
• To find the equation that models total profit y:
Step 1: Calculate the profit per ticket for each show:
- For the first show:[tex]({Profit per ticket} = \frac{300}{100} = 3)[/tex]
- For the second show: [tex]{Profit per ticket} = \frac{700 - 300}{200 - 100} = \frac{400}{100} = 4)[/tex]
So, the profit per ticket is consistent across both shows.
Step 2: Construct the equation:
Since profit is directly proportional to the number of tickets sold (each ticket contributes a fixed amount to the profit), the equation should reflect this linear relationship.
Let's use the slope-intercept form of a linear equation [tex](y = mx + c)[/tex], where m is the slope (profit per ticket) and c is the y-intercept (initial profit).
From our calculation, the profit per ticket m=4.
The y-intercept c can be found by substituting in one of the points. Let's use the first show:
[tex](300 = 4 \cdot 100 + c )[/tex]
[tex]( 300 = 400 + c)[/tex]
[tex](c = 300 - 400)[/tex]
[tex](c = -100)[/tex]
So, the equation becomes:
[tex](y = 4x - 100)[/tex]
Now, let's check which option matches this equation:
A. [tex]( y - 300 = 4(x - 100))[/tex]
- Simplifying: [tex]( y - 300 = 4x - 400)[/tex]
- Adding 300 to both sides: [tex]( y = 4x - 100)[/tex]
This matches our equation.
Therefore, the correct equation that models the total profit y based on the number of tickets sold x is:
[tex][ {A. \quad y - 300 = 4(x - 100)}][/tex]
We value your presence here. Keep sharing knowledge and helping others find the answers they need. This community is the perfect place to learn together. Discover insightful answers at IDNLearn.com. We appreciate your visit and look forward to assisting you again.